Construction: How does
it work here?
In years past, I would show Americans
and Europeans homes available in town, and while there were a very
few homes built to North American standards, there were even fewer
offered back onto the market. What were offered were to the local
taste, which is cramped and "plain vanilla" but more affordable.
Several intrepid souls embarked on
construction in those years, and more than half became very
frustrated doing so. That was because the architects were used to
designing for the local market, of course, and the contractors
were used to building for the local market. Of course,
seismic standards had been instated for many years, due to
necessity. But foreign homebuilders found a huge resistance in
both designers and builders to the standards they wanted to
achieve.
Foreigners wanted heavily insulated Nomex
wiring, marretted connections, ground-fault interruptors, vertical
grounded outlets, and shielded wiring routes. None of this was
even known here, and Marretts, or wire nuts, have only been
introduced here in the last few years. Computer owners still have
to specially ground a circuit for their valuable computer.
They wanted hot water. They wanted traps
below sinks. Septic tank venting. Window screens. Power-troweled
garage floors. None of
these were common
In addition, many materials taken for
granted by foreigners were not available.
But..
Happily, this is no longer the situation,
and both architects and builders, as well as suppliers, are
learning not to resist but to learn, because foreigners are
becoming a new market segment in Atenas and the entire
country. One foreigner after another
is completing a home as happily as mowing the lawn. We have done a
lot of adapting here, and now we have been adapted to as
well.
The Procedures
First step is to think carefully about the
size of home you can afford here (expect costs to be in the range
of $400 to $600 per m2). Design is very important, and since many
are coming here to retire, consider planning your home on one
floor; you may not be so spry on the stairs in 10 years. If you
plan for 3 bedrooms minimum, and 2 baths, you will enhance the
value for any eventual resale.
Wide overhangs are wise, since the walls,
and hence the house, stay cooler. Plan for screened ventilation
for attics or crawlspaces.
Next, draw a floor plan to visualize the
functionality of your home and its critical use areas.
Now, if you already have a lot, you will
still need to get a constancia, or evidence, of water
supply from the Municipality, the water institute AyA, or in case
of a well, with MINAE, the natural resources ministry.
It's time to select an architect, and he
must be affiliated with the Costa Rican college of
architects. Architects are allowed by the college and Presidential
decree to charge as much as 10.5% of the value of the home. They
elaborate a breakdown of the percentages to apply to individual
stages such as planning, design, permitting, materials list,
oversight, etc. But in fact is is common for architects to offer a
package percentage for these services. There are many
set taxes covered in the concept of this fee, and so there is a
limit as to how far it can lower. Generic plans are not yet used,
a plan must be drawn for each new home.
Permitting for homes over 90 m2 must be
taken out in both the Municipality and the national housing
authority, INVU. Plans may be subject to review by a new
environmental authority, SETENA. Architects are usually charged
with permitting responsibility.
Permits acquired, the owner will be required
to provide proof of a worker's compensation insurance taken out
with INS, the government insurance company, said policy premium a
percentage of the total labor cost of the home. Labor cost will be
calculated as 30% of the total cost of the house,
established with the municipality. Premium on this policy is
currently 4.66%, coverage for the entire term of construction.
Contractors
Contracting a home builder here has its
distinctions, as well. Most contractors haven't the capital base
to bring a house, say, to lockup stage, triggering an inspection
and a release of mortgage funds from the bank or owner. Likewise,
there is no program for bonding of the contractor.
As noted before, the onus of responsibility
for INS workers compensation insurance lies with the owner.
For these reasons and others many owner
homebuilders choose to be their own prime contractor, making a
notarized contract with a builder subcontractor for labor only,
who will have funds released to him at set stages as construction
progresses, and the owner will then proceed to supply materials as
needed.
Some owners make an agreement for the
building materials as well, allowing the subcontractor to
negotiate a per m2 labor and materials contract. In a time of
volatile materials prices, such as now, this is probably not
advisable with any but the most solvent San Jose construction
companies.
Some owners undertake to buy materials
and pay foreman and crew on an hourly basis, accepting the
role of employer and paymaster, maintaining the planilla or
payroll records for each employee, and paying social security at
the CCSS, or "Caja" each month. Wages are commonly disbursed each
Friday in cash, but for security many employers make direct
deposits to employees' bank accounts. Signed receipts for
cash payments are recommended, especially in the case of
non-recurring payments such as vacation time and aguinaldo, when
applicable. Any lawyer can review for you your current obligations
under Costa Rican labor law: in the case you write a labor
contract with a prime contractor, your labor contract must
stipulate his acceptance, and verification of payment, of his own
obligations, since ultimate responsibility usually rests with the
builder, yourself.
Materials
Building Supply companies will often allow
credit in materials purchases, and the buyer may designate a
certain employee to sign for supplies. Usually credit will not be
extended the full 30 days customary in North America, but only 15
days, when current invoices become due. Cash will often attract
substantial discounts, especially on certain products.
There can be incredible variances in prices
for the same product among various suppliers, and so it pays well
to shop around. Don't be afraid to verify what you think you heard
over the phone, because three and six sound almost identical in
Spanish, and so do sixty and seventy. Don't be afraid to get a
factura proforma for any price or list of prices. This is a
computer-generated limited-time quote, with time limits usually
specified, that can be faxed or emailed.
In procedures, architects, contractors, and
building supplies, be sure to talk to friends and acquaintances,
to learn who and what are the best resources and tactics available
at any time. I must stress emphatically that lead times for all
undertakings here in Costa Rica will be longer than you would
imagine, and it pays to plan as far ahead as possible.